Design, manufacturing and installation of 2 5.000 kg/h DO-fire boilers and a water heater for Trần-Đông A Ltd
Design, manufacturing and installation of 2 5.000 kg/h DO-fire boilers and a water heater
- Industry: Resort
- Client: Trần-Đông A Ltd
- Location: Danang City